Confirm voltage, amperage, panels, distribution and backup needs before finalizing equipment plans.
Why this issue matters
Electrical service and power capacity can affect more than the headline rent. It may change opening timing, fit-out cost, operating flexibility, insurance, financing, customer access and the amount required to leave the premises at the end. A lease can be legally valid yet still be a poor operational fit, so the decision should connect the document to the actual property and business plan.
Start with the current offer, floor plans, operating-cost information and the business requirements. Mark every item as confirmed, assumed, excluded or unresolved. A verbal assurance should be converted into clear written language or treated as uncertain.
Five items to verify
- Available service capacity: record the document, assumption, responsible party and deadline needed to verify it.
- Panel and circuit condition: record the document, assumption, responsible party and deadline needed to verify it.
- Three-phase or specialized power: record the document, assumption, responsible party and deadline needed to verify it.
- Metering and demand charges: record the document, assumption, responsible party and deadline needed to verify it.
- Upgrade route, approvals and cost: record the document, assumption, responsible party and deadline needed to verify it.
Cost and cash-flow lens
Model the full term rather than one month. Include deposits, professional fees, design, permits, construction, equipment, moving, downtime, base rent, additional rent, utilities, maintenance, insurance and restoration. Separate landlord incentives from costs that remain payable during an abatement. Where an amount can change, test a base case and a higher-cost case.
Timing matters as much as totals. Identify when deposits are due, when rent starts, when an allowance is reimbursed, when operating-cost reconciliations arrive and when renewal or termination notices must be delivered. A seemingly affordable lease can create a cash squeeze if these dates cluster before the business opens.
Questions for the offer and draft
- What does the proposal or draft say about available service capacity?
- What does the proposal or draft say about panel and circuit condition?
- What does the proposal or draft say about three-phase or specialized power?
- What does the proposal or draft say about metering and demand charges?
- What does the proposal or draft say about upgrade route, approvals and cost?
Property and operational review
Check the site in operation, not only during a quiet showing. Observe access, parking, loading, waste handling, noise, neighbouring uses, HVAC operation and building management. Match equipment and staffing plans to power, plumbing, ventilation, structural capacity, internet, security and hours of access. Where the proposed use can trigger zoning, licensing, fire, accessibility or building work, verify the approval route before waiving conditions.
Negotiation approach
Rank requested changes by business consequence. A clause that protects the permitted use, controls an uncertain pass-through or preserves assignment flexibility may be more valuable than a small face-rent reduction. Support requests with a plan, cost estimate or identified risk. Keep the letter of intent, lease draft, work letter, drawings and side agreements consistent.
Working verification table
| Topic | Status | Evidence needed |
|---|---|---|
| Available service capacity | Not verified | Document, inspection, quotation or professional review |
| Panel and circuit condition | Not verified | Document, inspection, quotation or professional review |
| Three-phase or specialized power | Not verified | Document, inspection, quotation or professional review |
| Metering and demand charges | Not verified | Document, inspection, quotation or professional review |
| Upgrade route, approvals and cost | Not verified | Document, inspection, quotation or professional review |
Before committing
- Confirm the legal name of the parties and authority to sign.
- Confirm the premises, area, measurement method and plans.
- Build a multi-year total occupancy budget with sensitivity cases.
- Complete property, approval, insurance and operational review.
- Have qualified advisers review matters within their professions.
- Record key dates, conditions, deliverables and responsibility for follow-up.